Roadmap & Timeline

Phased Approach to Orbital Manufacturing

Realistic milestones from Earth-based pilots to full international space manufacturing capability. Building the future, one phase at a time.

~2027

First Pilot Chips

Earth-based production

2028-2030

Orbital Pilots

First space manufacturing

2030s

Full Station

International capability

2035+

Multi-Planetary

Earth, Moon, Mars

Development Phases

Our phased approach balances ambition with realism, building on each success to enable the next.

Phase 1Current

Foundation & Earth Pilot

2025-2027

Establish partnerships, develop processes, and produce first pilot chips at Giga Texas advanced technology fab.

Ecosystem Formation

Align key partners: SpaceX, xAI/Tesla, Blue Origin, NASA ISAM

Process Development

Develop and refine planar processes optimized for space adaptation

Earth Pilot Chips

First functional AI chips from Giga Texas advanced technology fab

Orbital Design Finalization

Complete design for first LEO manufacturing modules

Phase 2

Orbital Pilots

2028-2030

Deploy first manufacturing modules to LEO. Demonstrate microgravity crystal growth and validate orbital processes.

First Module Launch

Deploy initial manufacturing module via Starship cargo

Microgravity Crystal Growth

First commercial-grade crystals grown in orbit

Process Validation

Demonstrate full planar process in orbital environment

Substrate Production

Begin producing specialty substrates for Earth-based chip fabrication

Phase 3

Scale & Integration

2030-2035

Expand orbital capacity, integrate with commercial space stations, and achieve volume production of specialty materials.

Multi-Module Facility

Expand to multiple connected manufacturing modules

Station Integration

Partner with Starlab, Axiom, or Orbital Reef for hosting

Volume Production

Achieve commercial volumes of orbital-produced materials

Full Hybrid Operations

Seamless Earth-orbit manufacturing pipeline operational

Phase 4

International Station

2035+

Full-scale international space manufacturing station with complete chip fabrication capabilities.

Dedicated Station

Purpose-built orbital manufacturing station

Complete Fab Capability

Full chip fabrication from substrate to packaged IC

Lunar Integration

Incorporate lunar resources for materials supply

Multi-Planetary Network

Manufacturing nodes supporting Earth, Moon, and Mars missions

Parallel Development

Hybrid Timeline

Earth and orbital tracks run in parallel, with each informing and accelerating the other.

Earth Track

Giga Texas Advanced Technology Fab

2025-26
Process development
2027
Pilot chip production
2028-30
Volume ramp + orbital material integration
2030+
Full hybrid production

Orbital Track

LEO Manufacturing Modules

2025-27
Module design + partner alignment
2028
First module launch
2029-30
Process validation + substrate production
2030+
Multi-module expansion

Continuous feedback loop between Earth iteration and orbital innovation

Realistic Expectations

Space manufacturing is hard. Timelines may shift based on launch availability, technology development, and funding. We believe in transparency about both opportunities and challenges.

Dependencies

  • • Starship operational cadence
  • • Commercial station availability
  • • Regulatory framework development
  • • Ecosystem partner alignment

Our Approach

  • • Phased risk reduction
  • • Parallel Earth development
  • • Strong partner network
  • • Flexible timeline adaptation

Be Part of the Journey

We're building the future of manufacturing. Join our ecosystem of partners, investors, and builders working toward the multi-planetary age.